Swindon

Abbey Scaffolding were tasked with erecting this dual purpose loading bay, made difficult by the below machinery needing to be bridged over.
The Loading bay was capable of being loaded up to 10 tonne on 1 lift and 5 tonne on the other lift at any one time, using either a forklift through the 8 meter wide swing over gate or the goods hoist.
We also provided full pedestrian access via a system Stair tower to full height.