Bristol

Abbey Scaffolding was given the responsibility to provide access to all elevations on the Apollo apartments In Bristol to ensure all combustible materials are removed and replaced to bring it in line with the current regulations.

The scaffold was complete in 3 phases, with tight timeframes met to ensure the client could progress with their works.
Due to its central location this project provided challenges logistically but Abbey Scaffolding managed the area ensuring segregation from the public which met the requirements of the local council.

There were areas of scaffold which required beams drilled into the subframe to support the multiple boarded lifts above due to the fragile roofs located throughout the perimeter of the building which was all erected as per design.

All elevations required fire retardant sheeting to provide full encapsulation which was provided and installed by our team.