This project formed part of the regeneration of Bristol City centre shopping scheme, the scaffold provided was fully encapsulated with protection fans for protection of the public and fully sheeted.

This was a demolition project which meant the scaffold needed to be dismantled progressively with the building. The structure was erected in just over a week with a team of only 4 operatives.

This project was particularly challenging as a demolition job in a very busy City Centre, Health and Safety was paramount at all times and as usual the operatives did not let us down showing a high standard of Health and Safety awareness at all times as well as finishing the job on time and with no problems, well done guys!

credit credit credit credit credit credit